Area to get new flooring in Arena. All the user group got to getther to raise over $20,000 for the replacement of the black flooring through out the area,
Volunteer are to help with the labour. the removal the the flooring was to happen April 8 but was cancelled due to Covid 19.
The town staff has moved forward with some repares to the floor.